ABOUT THE PROJECT
Located in the very heart of Kiev, on Lesi Ukrainky boulevard,7-9, NVER welcomes its guests with a grandiose lobby that unites two towers.
The space, created following the example of the world’s best hotels, includes a gallery of boutiques, a lobby bar and a unique service – a private depository with cells for storing valuables.
Above the NVER residential area, there is a real architectural wonder – a unique multifunctional bridge, more than 50 meters long. Panoramic indoor and outdoor pools located on the bridge allow you to swim and enjoy the views of your beloved city at any time of the year.
ARTHUR MKHITARYAN
UNIQUE FEATURES
The panoramic pools, indoor and outdoor, located on a bridge over 50 meters long, are a real architectural wonder.
There is no such thing in any complex in Europe.
The only one observation deck in Ukraine with a section of transparent glass in the floor, located on the roof of one of the towers, is the best way to see Kyiv from a bird’s eye view.
It makes NVER a new landmark of the capital. A magnet that in the future will attract Kyiv residents and guests of the city.
TSARSKY HOSPITALITY, a special five-star service, will provide you with a special treatment. It is created to meet the needs of NVER residents at any time of the day. A full-fledged concierge service will ensure the meeting of guests, control of order and cleanliness of the house.
Room-service will deliver everything you require directly to your apartment, as well as provide cleaning, catering and the ability to use the internal infrastructure of the complex. Another important priority is safety. The NVER provides 24-hour security posts, video surveillance and a digital access system. Everything you require for your peace of mind.
INFRASTRUCTURE
NVER HISTORY
APARTMENTS
LOCATION
CONSTRUCTION PROGRESS
done
in progress
pending
2021
Project concept
Design documentation of the "Project" stage
Obtaining a construction permit
2022
Correction of design documentation for the "Project" stage
Engineering surveys (geodesic, geological, seismological, hydrogeological)
Works on arranging a construction site, preparatory work on the construction site
Testing of piles
2023 (1-2 quarter)
Strengthening of reinforced concrete structures
Design documentation for the "Working documentation" stage in progress
Facade design works in progress
2023 (3 quarter)
Excavation
2023 (4 quarter)
Pile field
2024 (1-2 quarter)
Foundation
2024 (3 quarter)
Monolithic frame of underground floors
2025 (4 quarter)
Monolithic frame of aboveground floors
2026 (3 quarter)
Construction works
Facade works
Engineering systems
Finishing works and commissioning of the building