All preliminary work has been completed at the construction site of Nver.
• Comprehensive reinforcement of the retaining wall has been carried out.
• Necessary geodetic and geological surveys have been conducted.
• A tower crane has been installed.
Today marks the beginning of construction for the complex as the first piles are being installed on-site.
June 23, 2023