Work continues on the dismantling of existing reinforced concrete structures and works on the installation of water supply networks and electrification of the construction site.

Work continues on the dismantling of existing reinforced concrete structures and works on the installation of water supply networks and electrification of the construction site.

March 24, 2023

© All rights reserved. NVER, 2024.