<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>News Archives - NVER</title>
	<atom:link href="https://nver.com.ua/en/category/news/feed/" rel="self" type="application/rss+xml" />
	<link>https://nver.com.ua/en/category/news/</link>
	<description></description>
	<lastBuildDate>Mon, 16 Sep 2024 19:22:59 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.0.2</generator>
	<item>
		<title>NVER construction continues.</title>
		<link>https://nver.com.ua/en/2024/09/16/nver-construction-continues/</link>
					<comments>https://nver.com.ua/en/2024/09/16/nver-construction-continues/#respond</comments>
		
		<dc:creator><![CDATA[Oleh Filimonov]]></dc:creator>
		<pubDate>Mon, 16 Sep 2024 19:22:58 +0000</pubDate>
				<category><![CDATA[News]]></category>
		<guid isPermaLink="false">https://nver.com.ua/?p=534</guid>

					<description><![CDATA[<p>Active work continues at the NVER construction site according to plan. Right now, the foundation of the 2nd section is being laid and waterproofing works for the 3rd are being carried out, namely: ⁃ concrete mix laying for the 2nd section of the foundation has been completed; ⁃ the process of reinforcement and formwork installation [&#8230;]</p>
<p>The post <a href="https://nver.com.ua/en/2024/09/16/nver-construction-continues/">NVER construction continues.</a> appeared first on <a href="https://nver.com.ua/en/nver-legacy-of-the-future">NVER</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph">Active work continues at the NVER construction site according to plan.</p>



<p class="wp-block-paragraph">Right now, the foundation of the 2nd section is being laid and waterproofing works for the 3rd are being carried out, namely:</p>



<p class="wp-block-paragraph">⁃ concrete mix laying for the 2nd section of the foundation has been completed;</p>



<p class="wp-block-paragraph">⁃ the process of reinforcement and formwork installation for the foundation slab of the 3rd section is in progress;</p>



<p class="wp-block-paragraph">⁃ concrete preparation work for waterproofing for the 3rd section is underway, which ensures reliable moisture resistance;</p>



<p class="wp-block-paragraph">⁃ waterproofing works are continuing on the 3rd section to ensure the durability and stability of the building structures.</p>
<p>The post <a href="https://nver.com.ua/en/2024/09/16/nver-construction-continues/">NVER construction continues.</a> appeared first on <a href="https://nver.com.ua/en/nver-legacy-of-the-future">NVER</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://nver.com.ua/en/2024/09/16/nver-construction-continues/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Today we are celebrating a really important stage in the construction of Nver. </title>
		<link>https://nver.com.ua/en/2024/08/06/today-we-are-celebrating-a-really-important-stage-in-the-construction-of-nver/</link>
					<comments>https://nver.com.ua/en/2024/08/06/today-we-are-celebrating-a-really-important-stage-in-the-construction-of-nver/#respond</comments>
		
		<dc:creator><![CDATA[Oleh Filimonov]]></dc:creator>
		<pubDate>Tue, 06 Aug 2024 12:41:12 +0000</pubDate>
				<category><![CDATA[News]]></category>
		<guid isPermaLink="false">https://nver.com.ua/?p=525</guid>

					<description><![CDATA[<p>We completed one of the most complex engineering parts of the project &#8211; rolling 360 piles 9,000 meters across, which is above Everest. Now, finally, fill the foundation tile. This means that this year you will see the vertical elements of the tower frame grow! According to our ancient tradition, at the moment of filling [&#8230;]</p>
<p>The post <a href="https://nver.com.ua/en/2024/08/06/today-we-are-celebrating-a-really-important-stage-in-the-construction-of-nver/">Today we are celebrating a really important stage in the construction of Nver. </a> appeared first on <a href="https://nver.com.ua/en/nver-legacy-of-the-future">NVER</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph">We completed one of the most complex engineering parts of the project &#8211; rolling 360 piles 9,000 meters across, which is above Everest. Now, finally, fill the foundation tile. This means that this year you will see the vertical elements of the tower frame grow!</p>



<p class="wp-block-paragraph">According to our ancient tradition, at the moment of filling the foundation we place a time capsule with a message for future generations so that they know how to get through difficult times, keeping the strength of spirit and faith. The Nver project is indeed a symbol of heroism for anyone who makes the most of it, despite extremely difficult conditions.</p>



<p class="wp-block-paragraph">Each step brings us closer to the future we dream of living in.</p>



<p class="wp-block-paragraph">Find out details of buying apartments in the most innovative complex of Kiev:</p>



<p class="wp-block-paragraph">+38 044 290 71 76</p>



<figure class="wp-block-video"><video height="1920" style="aspect-ratio: 1080 / 1920;" width="1080" controls src="https://bunny-wp-pullzone-jj1jzwkoh2.b-cdn.net/wp-content/uploads/2024/08/IMG_5145.mp4"></video></figure>
<p>The post <a href="https://nver.com.ua/en/2024/08/06/today-we-are-celebrating-a-really-important-stage-in-the-construction-of-nver/">Today we are celebrating a really important stage in the construction of Nver. </a> appeared first on <a href="https://nver.com.ua/en/nver-legacy-of-the-future">NVER</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://nver.com.ua/en/2024/08/06/today-we-are-celebrating-a-really-important-stage-in-the-construction-of-nver/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		<enclosure url="https://bunny-wp-pullzone-jj1jzwkoh2.b-cdn.net/wp-content/uploads/2024/08/IMG_5145.mp4" length="70294127" type="video/mp4" />

			</item>
		<item>
		<title>The most innovative complex of the country is being built right now.</title>
		<link>https://nver.com.ua/en/2024/08/06/the-most-innovative-complex-of-the-country-is-being-built-right-now/</link>
					<comments>https://nver.com.ua/en/2024/08/06/the-most-innovative-complex-of-the-country-is-being-built-right-now/#respond</comments>
		
		<dc:creator><![CDATA[Oleh Filimonov]]></dc:creator>
		<pubDate>Tue, 06 Aug 2024 11:58:48 +0000</pubDate>
				<category><![CDATA[News]]></category>
		<guid isPermaLink="false">https://nver.com.ua/?p=515</guid>

					<description><![CDATA[<p>The following works are currently in progress. &#8211; pile head beating; &#8211; waterproofing works; &#8211; concrete preparation for waterproofing is performed; &#8211; foundation slab formwork is reinforced and installed; &#8211; arrangement of vertical structure reinforcement outlets from foundation slab. Find out details about the complex and the conditions for the purchase of apartments by number: [&#8230;]</p>
<p>The post <a href="https://nver.com.ua/en/2024/08/06/the-most-innovative-complex-of-the-country-is-being-built-right-now/">The most innovative complex of the country is being built right now.</a> appeared first on <a href="https://nver.com.ua/en/nver-legacy-of-the-future">NVER</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph">The following works are currently in progress.</p>



<p class="wp-block-paragraph">&#8211; pile head beating;</p>



<p class="wp-block-paragraph">&#8211; waterproofing works;</p>



<p class="wp-block-paragraph">&#8211; concrete preparation for waterproofing is performed;</p>



<p class="wp-block-paragraph">&#8211; foundation slab formwork is reinforced and installed;</p>



<p class="wp-block-paragraph">&#8211; arrangement of vertical structure reinforcement outlets from foundation slab.</p>



<p class="wp-block-paragraph">Find out details about the complex and the conditions for the purchase of apartments by number:</p>



<p class="wp-block-paragraph">+38 044 290 71 76</p>



<figure class="wp-block-video"><video height="1920" style="aspect-ratio: 1080 / 1920;" width="1080" controls src="https://bunny-wp-pullzone-jj1jzwkoh2.b-cdn.net/wp-content/uploads/2024/08/Video-1.mp4"></video></figure>
<p>The post <a href="https://nver.com.ua/en/2024/08/06/the-most-innovative-complex-of-the-country-is-being-built-right-now/">The most innovative complex of the country is being built right now.</a> appeared first on <a href="https://nver.com.ua/en/nver-legacy-of-the-future">NVER</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://nver.com.ua/en/2024/08/06/the-most-innovative-complex-of-the-country-is-being-built-right-now/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		<enclosure url="https://bunny-wp-pullzone-jj1jzwkoh2.b-cdn.net/wp-content/uploads/2024/08/Video-1.mp4" length="51513593" type="video/mp4" />

			</item>
		<item>
		<title>Construction of Nver is ongoing.</title>
		<link>https://nver.com.ua/en/2024/06/05/construction-of-nver-is-ongoing/</link>
					<comments>https://nver.com.ua/en/2024/06/05/construction-of-nver-is-ongoing/#respond</comments>
		
		<dc:creator><![CDATA[Oleh Filimonov]]></dc:creator>
		<pubDate>Wed, 05 Jun 2024 16:08:47 +0000</pubDate>
				<category><![CDATA[News]]></category>
		<guid isPermaLink="false">https://nver.com.ua/?p=480</guid>

					<description><![CDATA[<p>Construction of Nver is ongoing. Currently, engineering works for the installation of the foundation slab are being carried out, specifically: &#8211; Earthworks and manual finishing of the excavation pit; &#8211; Pile head trimming; &#8211; Drainage and protective screed; &#8211; Installing the enclosure piles of the excavation pit; &#8211; Installation of temporary metal supports; &#8211; Waterproofing [&#8230;]</p>
<p>The post <a href="https://nver.com.ua/en/2024/06/05/construction-of-nver-is-ongoing/">Construction of Nver is ongoing.</a> appeared first on <a href="https://nver.com.ua/en/nver-legacy-of-the-future">NVER</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph">Construction of Nver is ongoing. Currently, engineering works for the installation of the foundation slab are being carried out, specifically:</p>



<p class="wp-block-paragraph">&#8211; Earthworks and manual finishing of the excavation pit;</p>



<p class="wp-block-paragraph">&#8211; Pile head trimming;</p>



<p class="wp-block-paragraph">&#8211; Drainage and protective screed;</p>



<p class="wp-block-paragraph">&#8211; Installing the enclosure piles of the excavation pit;</p>



<p class="wp-block-paragraph">&#8211; Installation of temporary metal supports;</p>



<p class="wp-block-paragraph">&#8211; Waterproofing works;</p>



<p class="wp-block-paragraph">&#8211; Construction of temporary roads.</p>



<p class="wp-block-paragraph">Stay tuned for further updates on the progress of Nver construction on our social media pages.</p>



<figure class="wp-block-video"><video height="480" style="aspect-ratio: 268 / 480;" width="268" controls src="https://bunny-wp-pullzone-jj1jzwkoh2.b-cdn.net/wp-content/uploads/2024/06/IMG_6775-video-converter.com_-1.mp4"></video></figure>
<p>The post <a href="https://nver.com.ua/en/2024/06/05/construction-of-nver-is-ongoing/">Construction of Nver is ongoing.</a> appeared first on <a href="https://nver.com.ua/en/nver-legacy-of-the-future">NVER</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://nver.com.ua/en/2024/06/05/construction-of-nver-is-ongoing/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		<enclosure url="https://bunny-wp-pullzone-jj1jzwkoh2.b-cdn.net/wp-content/uploads/2024/06/IMG_6775-video-converter.com_-1.mp4" length="1037889" type="video/mp4" />

			</item>
		<item>
		<title>Works on laying the foundation slab have begun</title>
		<link>https://nver.com.ua/en/2024/03/11/works-on-laying-the-foundation-slab-have-begun/</link>
					<comments>https://nver.com.ua/en/2024/03/11/works-on-laying-the-foundation-slab-have-begun/#respond</comments>
		
		<dc:creator><![CDATA[Oleh Filimonov]]></dc:creator>
		<pubDate>Mon, 11 Mar 2024 20:48:24 +0000</pubDate>
				<category><![CDATA[News]]></category>
		<guid isPermaLink="false">https://nver.com.ua/?p=469</guid>

					<description><![CDATA[<p>We are moving to the next stage in the construction of the country&#8217;s most innovative complex. 300+ piles have been installed. Therefore, the foundation field of residential section Nver is completed. Works on laying the foundation slab have begun — we are moving forward right now. Find out more details about the complex and special [&#8230;]</p>
<p>The post <a href="https://nver.com.ua/en/2024/03/11/works-on-laying-the-foundation-slab-have-begun/">Works on laying the foundation slab have begun</a> appeared first on <a href="https://nver.com.ua/en/nver-legacy-of-the-future">NVER</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph">We are moving to the next stage in the construction of the country&#8217;s most innovative complex. 300+ piles have been installed. Therefore, the foundation field of residential section Nver is completed. Works on laying the foundation slab have begun — we are moving forward right now.</p>



<p class="wp-block-paragraph">Find out more details about the complex and special conditions for purchasing apartments in Nver by calling:</p>



<p class="wp-block-paragraph">+38 044 290 71 76</p>
<p>The post <a href="https://nver.com.ua/en/2024/03/11/works-on-laying-the-foundation-slab-have-begun/">Works on laying the foundation slab have begun</a> appeared first on <a href="https://nver.com.ua/en/nver-legacy-of-the-future">NVER</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://nver.com.ua/en/2024/03/11/works-on-laying-the-foundation-slab-have-begun/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Nver is your new experience of life in the center of Kyiv.</title>
		<link>https://nver.com.ua/en/2023/11/07/nver-is-your-new-experience-of-life-in-the-center-of-kyiv/</link>
					<comments>https://nver.com.ua/en/2023/11/07/nver-is-your-new-experience-of-life-in-the-center-of-kyiv/#respond</comments>
		
		<dc:creator><![CDATA[Oleh Khavruk]]></dc:creator>
		<pubDate>Tue, 07 Nov 2023 19:17:02 +0000</pubDate>
				<category><![CDATA[News]]></category>
		<guid isPermaLink="false">https://nver.com.ua/?p=413</guid>

					<description><![CDATA[<p>Located in the heart of Kyiv, at Lesi Ukrainki Boulevard, 7-9, NVER welcomes guests with a grand lobby that unites two towers. The space, designed following the example of the world&#8217;s best hotels, includes a boutique gallery, lobby bar, coworking, children&#8217;s center, Fitness, and Spa by the creators of TSARSKY, an observation platform, restaurants, a [&#8230;]</p>
<p>The post <a href="https://nver.com.ua/en/2023/11/07/nver-is-your-new-experience-of-life-in-the-center-of-kyiv/">Nver is your new experience of life in the center of Kyiv.</a> appeared first on <a href="https://nver.com.ua/en/nver-legacy-of-the-future">NVER</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph">Located in the heart of Kyiv, at Lesi Ukrainki Boulevard, 7-9, NVER welcomes guests with a grand lobby that unites two towers.</p>



<p class="wp-block-paragraph">The space, designed following the example of the world&#8217;s best hotels, includes a boutique gallery, lobby bar, coworking, children&#8217;s center, Fitness, and Spa by the creators of TSARSKY, an observation platform, restaurants, a wine room, and a unique service &#8211; a private depository with storage compartments for valuable items.</p>



<p class="wp-block-paragraph">Above the residential area of NVER is a true architectural marvel &#8211; a unique multifunctional bridge over 50 meters long. Panoramic indoor and outdoor pools on the bridge allow you to swim and enjoy views of your beloved city year-round.</p>



<p class="wp-block-paragraph">Construction work is actively ongoing at the Nver construction site. One hundred piles have already been installed.</p>



<p class="wp-block-paragraph">&nbsp;Find out the details of your future dream apartment via direct message or by calling:</p>



<p class="wp-block-paragraph">+38 044 290 71 76</p>
<p>The post <a href="https://nver.com.ua/en/2023/11/07/nver-is-your-new-experience-of-life-in-the-center-of-kyiv/">Nver is your new experience of life in the center of Kyiv.</a> appeared first on <a href="https://nver.com.ua/en/nver-legacy-of-the-future">NVER</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://nver.com.ua/en/2023/11/07/nver-is-your-new-experience-of-life-in-the-center-of-kyiv/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Sales of apartments on the 24th floor of the premium Nver complex in the heart of Kyiv are now open!</title>
		<link>https://nver.com.ua/en/2023/10/24/sales-of-apartments-on-the-24th-floor-of-the-premium-nver-complex-in-the-heart-of-kyiv-are-now-open/</link>
					<comments>https://nver.com.ua/en/2023/10/24/sales-of-apartments-on-the-24th-floor-of-the-premium-nver-complex-in-the-heart-of-kyiv-are-now-open/#respond</comments>
		
		<dc:creator><![CDATA[Oleh Khavruk]]></dc:creator>
		<pubDate>Tue, 24 Oct 2023 19:13:00 +0000</pubDate>
				<category><![CDATA[News]]></category>
		<guid isPermaLink="false">https://nver.com.ua/?p=407</guid>

					<description><![CDATA[<p>Nver is a premium residential complex with infrastructure that will redefine your lifestyle. Nver will offer: • Indoor and outdoor panoramic pools • Business center with flex offices and meeting rooms • Private depository • Children&#8217;s center • Fitness &#38; Spa by the creators of TSARSKY • Viewing platform • Restaurants • Cigar room and [&#8230;]</p>
<p>The post <a href="https://nver.com.ua/en/2023/10/24/sales-of-apartments-on-the-24th-floor-of-the-premium-nver-complex-in-the-heart-of-kyiv-are-now-open/">Sales of apartments on the 24th floor of the premium Nver complex in the heart of Kyiv are now open!</a> appeared first on <a href="https://nver.com.ua/en/nver-legacy-of-the-future">NVER</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph">Nver is a premium residential complex with infrastructure that will redefine your lifestyle. Nver will offer:</p>



<p class="wp-block-paragraph">• Indoor and outdoor panoramic pools</p>



<p class="wp-block-paragraph">• Business center with flex offices and meeting rooms</p>



<p class="wp-block-paragraph">• Private depository</p>



<p class="wp-block-paragraph">• Children&#8217;s center</p>



<p class="wp-block-paragraph">• Fitness &amp; Spa by the creators of TSARSKY</p>



<p class="wp-block-paragraph">• Viewing platform</p>



<p class="wp-block-paragraph">• Restaurants</p>



<p class="wp-block-paragraph">• Cigar room and wine room</p>



<p class="wp-block-paragraph">• Boutique Gallery</p>



<p class="wp-block-paragraph">Location: Lesi Ukrainki Boulevard, 7-9</p>



<p class="wp-block-paragraph">Construction work is actively ongoing at the Nver construction site. Ninety piles have already been installed.</p>



<p class="wp-block-paragraph">Find out the details about your future dream apartment in Nver with captivating views of Kyiv by calling:</p>



<p class="wp-block-paragraph">+38 044 290 71 76</p>
<p>The post <a href="https://nver.com.ua/en/2023/10/24/sales-of-apartments-on-the-24th-floor-of-the-premium-nver-complex-in-the-heart-of-kyiv-are-now-open/">Sales of apartments on the 24th floor of the premium Nver complex in the heart of Kyiv are now open!</a> appeared first on <a href="https://nver.com.ua/en/nver-legacy-of-the-future">NVER</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://nver.com.ua/en/2023/10/24/sales-of-apartments-on-the-24th-floor-of-the-premium-nver-complex-in-the-heart-of-kyiv-are-now-open/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>We had a meeting with the Expolight team regarding the lighting for Nver.</title>
		<link>https://nver.com.ua/en/2023/10/15/we-had-a-meeting-with-the-expolight-team-regarding-the-lighting-for-nver/</link>
					<comments>https://nver.com.ua/en/2023/10/15/we-had-a-meeting-with-the-expolight-team-regarding-the-lighting-for-nver/#respond</comments>
		
		<dc:creator><![CDATA[Oleh Khavruk]]></dc:creator>
		<pubDate>Sun, 15 Oct 2023 19:10:00 +0000</pubDate>
				<category><![CDATA[News]]></category>
		<guid isPermaLink="false">https://nver.com.ua/?p=401</guid>

					<description><![CDATA[<p>Lighting is a separate and crucial element in creating the futuristic image of the premium Nver complex. Therefore, we pay special attention to every lighting accent. We had a meeting with the Expolight team, one of the best lighting companies in Ukraine for large-scale and innovative projects. Stay tuned for project updates – we are [&#8230;]</p>
<p>The post <a href="https://nver.com.ua/en/2023/10/15/we-had-a-meeting-with-the-expolight-team-regarding-the-lighting-for-nver/">We had a meeting with the Expolight team regarding the lighting for Nver.</a> appeared first on <a href="https://nver.com.ua/en/nver-legacy-of-the-future">NVER</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph">Lighting is a separate and crucial element in creating the futuristic image of the premium Nver complex. Therefore, we pay special attention to every lighting accent.</p>



<p class="wp-block-paragraph">We had a meeting with the Expolight team, one of the best lighting companies in Ukraine for large-scale and innovative projects.</p>



<p class="wp-block-paragraph">Stay tuned for project updates – we are creating the most innovative home in the country.</p>



<p class="wp-block-paragraph"><img src="https://s.w.org/images/core/emoji/17.0.2/72x72/1f4de.png" alt="📞" class="wp-smiley" style="height: 1em; max-height: 1em;" /> Find out details about purchasing apartments now:</p>



<p class="wp-block-paragraph">+38 044 290 71 76</p>
<p>The post <a href="https://nver.com.ua/en/2023/10/15/we-had-a-meeting-with-the-expolight-team-regarding-the-lighting-for-nver/">We had a meeting with the Expolight team regarding the lighting for Nver.</a> appeared first on <a href="https://nver.com.ua/en/nver-legacy-of-the-future">NVER</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://nver.com.ua/en/2023/10/15/we-had-a-meeting-with-the-expolight-team-regarding-the-lighting-for-nver/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>120 piles have already been installed at the Nver construction site.</title>
		<link>https://nver.com.ua/en/2023/10/08/120-piles-have-already-been-installed-at-the-nver-construction-site/</link>
					<comments>https://nver.com.ua/en/2023/10/08/120-piles-have-already-been-installed-at-the-nver-construction-site/#respond</comments>
		
		<dc:creator><![CDATA[Oleh Khavruk]]></dc:creator>
		<pubDate>Sun, 08 Oct 2023 19:04:00 +0000</pubDate>
				<category><![CDATA[News]]></category>
		<guid isPermaLink="false">https://nver.com.ua/?p=394</guid>

					<description><![CDATA[<p>120 piles have already been installed at the Nver construction site. One lower and four upper tie beams have been completed in the stilt foundation area, along with four metal supports ensuring the stability of existing retaining walls in the stilt foundation area. Find out the details of the investment offer by calling: +38 044 [&#8230;]</p>
<p>The post <a href="https://nver.com.ua/en/2023/10/08/120-piles-have-already-been-installed-at-the-nver-construction-site/">120 piles have already been installed at the Nver construction site.</a> appeared first on <a href="https://nver.com.ua/en/nver-legacy-of-the-future">NVER</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph">120 piles have already been installed at the Nver construction site.</p>



<p class="wp-block-paragraph">One lower and four upper tie beams have been completed in the stilt foundation area, along with four metal supports ensuring the stability of existing retaining walls in the stilt foundation area.</p>



<p class="wp-block-paragraph">Find out the details of the investment offer by calling:</p>



<p class="wp-block-paragraph">+38 044 290 71 76</p>
<p>The post <a href="https://nver.com.ua/en/2023/10/08/120-piles-have-already-been-installed-at-the-nver-construction-site/">120 piles have already been installed at the Nver construction site.</a> appeared first on <a href="https://nver.com.ua/en/nver-legacy-of-the-future">NVER</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://nver.com.ua/en/2023/10/08/120-piles-have-already-been-installed-at-the-nver-construction-site/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>As of September 21st, 90+ piles have been installed at the Nver construction site.</title>
		<link>https://nver.com.ua/en/2023/09/21/as-of-september-21st-90-piles-have-been-installed-at-the-nver-construction-site/</link>
					<comments>https://nver.com.ua/en/2023/09/21/as-of-september-21st-90-piles-have-been-installed-at-the-nver-construction-site/#respond</comments>
		
		<dc:creator><![CDATA[Oleh Khavruk]]></dc:creator>
		<pubDate>Thu, 21 Sep 2023 18:53:00 +0000</pubDate>
				<category><![CDATA[News]]></category>
		<guid isPermaLink="false">https://nver.com.ua/?p=388</guid>

					<description><![CDATA[<p>Monthly pile installation progress: +40 piles. Two upper tie beams have been completed in the stilt foundation area, ensuring the stabilization of existing retaining walls. The premium Nver complex is actively in the process of creation. Find out the details of purchasing apartments by calling: +38 044 290 71 76</p>
<p>The post <a href="https://nver.com.ua/en/2023/09/21/as-of-september-21st-90-piles-have-been-installed-at-the-nver-construction-site/">As of September 21st, 90+ piles have been installed at the Nver construction site.</a> appeared first on <a href="https://nver.com.ua/en/nver-legacy-of-the-future">NVER</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph">Monthly pile installation progress: +40 piles.</p>



<p class="wp-block-paragraph">Two upper tie beams have been completed in the stilt foundation area, ensuring the stabilization of existing retaining walls.</p>



<p class="wp-block-paragraph">The premium Nver complex is actively in the process of creation.</p>



<p class="wp-block-paragraph">Find out the details of purchasing apartments by calling:</p>



<p class="wp-block-paragraph">+38 044 290 71 76</p>
<p>The post <a href="https://nver.com.ua/en/2023/09/21/as-of-september-21st-90-piles-have-been-installed-at-the-nver-construction-site/">As of September 21st, 90+ piles have been installed at the Nver construction site.</a> appeared first on <a href="https://nver.com.ua/en/nver-legacy-of-the-future">NVER</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://nver.com.ua/en/2023/09/21/as-of-september-21st-90-piles-have-been-installed-at-the-nver-construction-site/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
	</channel>
</rss>
